A line upgrade may aim at higher output, less handling, better consistency or shorter changeovers. Before the project begins, use production data to pinpoint the part of the process that needs the most attention.
Group the product range
Sort existing products by box type, dimensions, steel strip and buckle. The equipment plan should put the main production volume first while keeping a practical path for special products.
Map the current process
Record material entry, every processing step, temporary storage and finished-product exit. Real handling distance and waiting time often reveal more than the nominal speed of one machine.
Confirm the delivery boundary
Settle electrical interfaces, air supply, foundations, logistics access, installation timing and trial materials in advance so equipment manufacturing and site preparation can move forward together.
